Loading question...
You are in free guest mode. Timed Practice Revision List Attempt History Progress Tracking Create a free account to unlock these tools
Prev Next
CELPIP Practice Listening: Discussion ID: #61485 Medium Public Art in Hamilton Parks
Instructions ›
  • You will watch a 2-minute video. Then 8 questions will appear.
  • Choose the best way to answer each question.
AI explanationShows the answer. Tap to open.

Correct Answer: One hundred and twenty thousand dollars.

Why this is correct: The opening states the city’s allocation as one hundred and twenty thousand dollars for this fiscal year. Later maintenance costs are a separate estimate, not the allocation.

Tips: Distinguish the budget allocation from later cost estimates.

Why the other options are wrong:

  • Two hundred thousand dollars.: Two hundred thousand is not the allocation stated in the opening.
  • Sixty-five thousand dollars.: Sixty-five thousand is not stated as the city’s public-art budget.
  • Eighty thousand dollars.: Eighty thousand is not the stated allocation; the opening gives one hundred and twenty thousand.

Correct Answer: An interactive light sculpture, an Indigenous mosaic, and a kinetic wind piece.

Why this is correct: The shortlist recommendations are the interactive light sculpture, the Indigenous mosaic and the kinetic wind piece. The speaker says all three fit community engagement and cultural diversity goals.

Tips: Keep the complete three-item list together.

Why the other options are wrong:

  • A glass canopy, a painted crosswalk, and a rotating sculpture tower.: Canopy/crosswalk/tower are not shortlisted.
  • A digital art projection, a community garden installation, and a steel monument.: Projection/garden/monument are not shortlisted.
  • A bronze fountain, a heritage mural, and a children's playground sculpture.: Fountain/mural/playground sculpture are not shortlisted.

Correct Answer: It requires an electrical connection, and maintenance and power over five years could add fifteen thousand dollars.

Why this is correct: The light sculpture needs an electrical connection, and maintenance and power could add fifteen thousand dollars over five years. Those combined ongoing costs were not included in the artist's budget.

Tips: Choose the problem the speaker actually states, not one that only sounds likely for a sculpture.

Why the other options are wrong:

  • The design is too large for the proposed location in Gore Park.: Excess size is not raised.
  • The artist has no experience creating public installations.: Artist inexperience is not raised.
  • The materials used in the sculpture are not weather-resistant.: Weather resistance is not raised.

Correct Answer: Setting renewable power, such as solar, as a condition of approval.

Why this is correct: Renewable power, such as a solar redesign, is suggested as a condition of approval. The discussion favours adapting the sculpture to solar to avoid dependence on hydro power.

Tips: Identify the approval condition proposed to address the power problem.

Why the other options are wrong:

  • Connecting the sculpture to a nearby building's electrical supply.: Using a nearby building is not proposed.
  • Asking the City to waive the hydro charges for public art installations.: Waived hydro charges are not proposed.
  • Reducing the number of lights in the sculpture to lower energy use.: Fewer lights is not proposed.

Correct Answer: The proposal mentions community consultation with Six Nations but lacks a timeline and budget for it.

Why this is correct: The mosaic proposal mentions consultation with Six Nations but provides no timeline or budget for it. The committee wants to know whether consultation is complete and, if not, how long it will take.

Tips: Check whether each problem in the options is actually mentioned for this proposal.

Why the other options are wrong:

  • The materials for the mosaic are not available from local suppliers.: Supplier availability is not raised.
  • The proposed waterfront location floods frequently in the spring.: Waterfront flooding is not raised.
  • The mosaic design does not reflect the cultural diversity of Hamilton.: Lack of cultural diversity is not raised.

Correct Answer: It is straightforward and should be approved as is.

Why this is correct: The wind piece is described as straightforward and suitable for approval as it is. Its engineering review is clean, with low maintenance and no electrical needs.

Tips: Match the response to the wind piece, keeping it separate from conditions for the other two works.

Why the other options are wrong:

  • It requires additional community consultation before approval.: Further consultation is not required for the wind piece.
  • It needs a complete redesign before the committee can approve it.: Redesign is not required for it.
  • It is too expensive and should be replaced with a cheaper alternative.: Excess cost is not raised for it.

Correct Answer: Cities like Kitchener have already started requiring renewable power sources.

Why this is correct: The speaker cites cities such as Kitchener as already requiring renewable power for illuminated public art. This reported precedent supports the proposed renewable-power condition.

Tips: Check which example is actually named, not one that only sounds similar.

Why the other options are wrong:

  • The federal government's green energy mandate for all public projects.: A federal mandate is not cited.
  • A recent court ruling that bans grid-powered outdoor art in Ontario.: A court ban is not cited.
  • Hamilton's own climate action plan requires all new installations to be carbon neutral.: Hamilton carbon neutrality is not cited.

Correct Answer: Conditionally approve the light sculpture pending solar redesign, request a consultation plan for the mosaic, and approve the wind piece outright.

Why this is correct: The closing summary explicitly gives three different outcomes: conditional approval of the light sculpture after a solar redesign, a request for the mosaic’s consultation plan, and outright approval of the wind piece. Earlier responses support those separate outcomes, so no consensus has to be invented.

Tips: For a multi-part decision, check every action and condition; one correct element does not validate the whole option.

Why the other options are wrong:

  • Approve all three with no conditions and submit them to the committee.: The sculpture has a solar condition and the mosaic still needs a consultation plan; all three are not approved without conditions.
  • Defer all three proposals until next fiscal year when the budget is larger.: The wind piece is approved and the other proposals have specific follow-ups; there is no decision to defer everything to next fiscal year.
  • Reject the light sculpture, approve the mosaic, and defer the wind piece.: The light sculpture is conditionally approved, the mosaic needs a plan, and the wind piece is approved outright. The outcomes are not rejection, approval and deferral.

The rest of this explanation is for members. Sign in free to read why the other options are wrong, key words and tips.

Sign in to read the full explanation

With a free account: Retry and compare every attempt.
Be the first! No community answers here yet. Submit yours and help others learn.
Saving...