Loading question...
You are in free guest mode. Timed Practice Revision List Attempt History Progress Tracking Create a free account to unlock these tools
Prev Next
CELPIP Practice Listening: Listening for Information ID: #60720 Hard Home EV Charger Options
Instructions ›
  • You will hear a conversation followed by 6 questions.
  • Listen to each question. You will hear the question only once.
  • Choose the best answer to each question.
AI explanationShows the answer. Tap to open.

Correct Answer: Because her existing electrical panel may not support it without upgrades.

Why this is correct: The electrician says a 48-amp charger usually is not allowed with a 100-amp panel unless the panel is upgraded or a load-management device is added.

Why the other options are wrong:

  • Because winter temperatures in Milton reduce charging efficiency.: Winter temperatures are mentioned later about charging speed, not about why 48 amps is unsuitable.
  • Because her utility company does not allow chargers above 40 amps.: The utility company is not mentioned as blocking chargers above 40 amps.
  • Because plug-in chargers are required for higher amperage.: Plug-in chargers are not required for higher amperage. The electrician says hardwired units are needed for above 40 amps.

Correct Answer: It is more reliable during Canadian winters.

Why this is correct: The electrician says hardwired units are more reliable in winter and notes that this matters locally, without explaining a connection-failure mechanism.

Why the other options are wrong:

  • It always charges faster regardless of amperage.: The provider does not say hardwired chargers always charge faster. Speed depends on amperage, not how the unit is connected.
  • It can be installed without an ESA permit.: The provider says all installations need an ESA permit, including plug-in versions.
  • It qualifies automatically for provincial rebates.: Provincial rebates are not mentioned in the conversation.

Correct Answer: It costs significantly less to install.

Why this is correct: A panel upgrade costs $3,500 to $5,000, while a load management device costs about $1,200. The woman prefers the device because it costs much less than upgrading her entire electrical panel.

Why the other options are wrong:

  • It eliminates the need for an electrical permit.: The load management device does not eliminate the need for an ESA permit.
  • It enables the use of a more powerful charger.: The device balances electrical usage by reducing charging when other appliances run. It does not raise the panel’s capacity, although it can help allow a 48-amp charger without upgrading the panel.
  • It is required by the local utility company.: The local utility company is not mentioned as requiring this device.

Correct Answer: Installing a smart charger that can share electrical load.

Why this is correct: The electrician recommends a smart charger that can share the electrical load between two vehicles. the provider says it costs about $300 more upfront but avoids another major electrical upgrade later when a second EV arrives.

Why the other options are wrong:

  • Using two separate plug-in chargers.: The electrician recommends a smart charger that shares load between two vehicles, rather than two separate plug-in chargers.
  • Waiting until provincial regulations change.: The provider does not mention waiting for regulation changes.
  • Upgrading immediately to a 200-amp panel.: The provider recommends avoiding the full panel upgrade, not doing it immediately.

Correct Answer: She wants to minimise major renovation costs.

Why this is correct: The woman asks about the cost of a panel upgrade and says she would prefer not to do one. She chooses the load management device over the more expensive panel upgrade. Throughout the conversation, she tries to find practical solutions without major renovation expenses.

Why the other options are wrong:

  • She is focused on avoiding any permits or inspections.: She does not try to avoid permits. She asks if permits are included and seems fine with them.
  • She wants the fastest possible charging speed available.: She does not push for the fastest charging. She accepts the 40-amp option.
  • She plans to sell the house in the near future.: Selling the house is not mentioned at any point.

Correct Answer: The electrician will proceed with permits and scheduling.

Why this is correct: The woman agrees on the smart 40-amp hardwired option with load management. The electrician says the provider handles the ESA permit, inspection, and coordination. The natural next step is for the provider to begin the permit and scheduling process.

Why the other options are wrong:

  • The woman will delay the installation until winter.: She does not say she will delay until winter. She seems ready to proceed now.
  • The woman will compare quotes from other provinces.: She does not mention comparing quotes from other provinces.
  • The electrician will arrange a panel upgrade immediately.: They agreed to avoid the panel upgrade. The electrician will not arrange one.

The rest of this explanation is for members. Sign in free to read why the other options are wrong, key words and tips.

Sign in to read the full explanation

With a free account: Retry and compare every attempt.
Be the first! No community answers here yet. Submit yours and help others learn.
Saving...