Loading question...
You are in free guest mode. Timed Practice Revision List Attempt History Progress Tracking Create a free account to unlock these tools
Prev Next
CELPIP Practice Listening: News Item ID: #60802 Medium Alberta Renewable Farm Launch
Instructions ›
  • You will hear a news item once. It is about 1.5 minutes long.
  • Then 5 questions will appear.
  • Choose the best way to complete each statement from the drop-down menu.
AI explanationShows the answer. Tap to open.

Correct Answer: the opening of a renewable energy farm.

Why this is correct: The entire report is about a new renewable energy farm opening in southern Alberta. It describes the Prairie Breeze Energy Centre, its power capacity, investment, and jobs created.

Why the other options are wrong:

  • concerns about summer power shortages.: The report does not mention any summer power shortages or concerns about them.
  • a new electricity pricing policy.: There is no discussion of electricity pricing or any new pricing policy.
  • job losses in the energy sector.: The report talks about job creation, not job losses in the energy sector.

Correct Answer: a combination of wind and solar.

Why this is correct: The transcript says the energy centre combines wind turbines and solar panels. It produces 120 megawatts from wind and 60 megawatts from solar, for a total of 180 megawatts.

Why the other options are wrong:

  • only wind turbines on farmland.: The centre uses both wind and solar, not only wind turbines.
  • solar panels and natural gas.: There is no mention of natural gas being used at this facility.
  • hydroelectric and geothermal systems.: The transcript does not mention hydroelectric or geothermal systems at all.

Correct Answer: energy minister Rebecca Schulz.

Why this is correct: The transcript says Energy Minister Rebecca Schulz made the statement about strengthening grid reliability while reducing emissions. She also mentioned supporting Alberta's goal of diversifying electricity production.

Why the other options are wrong:

  • a system operator spokesperson.: The system operator is mentioned for monitoring, but this specific statement came from the minister.
  • the project construction manager.: There is no quote from a construction manager in the report.
  • a Vulcan County representative.: No Vulcan County representative is quoted making this statement.

Correct Answer: generally positive but measured.

Why this is correct: The report highlights the benefits of the project like clean energy and jobs, but also mentions a monitoring period and the need for regulatory approval before expansion. This makes the tone positive but measured.

Why the other options are wrong:

  • uncertain about the project's future.: The report sounds confident about the project, not uncertain about its future.
  • urgent and alarmist.: There is nothing urgent or alarmist in the report - it is calm and factual.
  • critical of renewable energy development.: The report supports renewable energy development rather than criticizing it.

Correct Answer: monitor performance and grid impact.

Why this is correct: The transcript says operators will work with the Alberta Utilities Commission and system operator over the next six months to monitor performance and grid impact. Monitoring is the stated activity for that period.

Why the other options are wrong:

  • begin building additional turbines immediately.: The report says expansion could be proposed next year, not that building would begin immediately.
  • hold a public county referendum.: There is no mention of a public referendum or county vote.
  • reduce the current power output.: Nothing in the transcript suggests reducing current power output.

The rest of this explanation is for members. Sign in free to read why the other options are wrong, key words and tips.

Sign in to read the full explanation

With a free account: Retry and compare every attempt.
Be the first! No community answers here yet. Submit yours and help others learn.
Saving...