Loading question...
You are in free guest mode. Timed Practice Revision List Attempt History Progress Tracking Create a free account to unlock these tools
Prev Next
CELPIP Practice Listening: Listening for Information ID: #60682 Medium Choosing a Backyard Pool
Instructions ›
  • You will hear a conversation followed by 6 questions.
  • Listen to each question. You will hear the question only once.
  • Choose the best answer to each question.
AI explanationShows the answer. Tap to open.

Correct Answer: She may sell her home in a few years.

Why this is correct: The woman says the family might move in five or six years, so she is cautious about spending too much on a pool. The possibility of moving is her stated reason.

Why the other options are wrong:

  • She prefers to travel during the summer.: She does not mention preferring to travel during the summer instead of swimming.
  • She is worried about ongoing maintenance costs.: Maintenance costs are raised later in the conversation, not as her primary concern.
  • Her children are still very young.: Her children's ages are not the reason she is cautious about spending.

Correct Answer: Approximately eight to ten weeks.

Why this is correct: The installer says in-ground pools often take eight to ten weeks to complete. This is partly because of excavation and municipal inspections. It is much longer than the two weeks needed for above-ground pools.

Why the other options are wrong:

  • About two weeks after permits are approved.: Two weeks is the timeline for above-ground pool installation, not in-ground.
  • Roughly one month including inspections.: One month is shorter than the eight-to-ten-week range the installer gives.
  • Six to seven weeks depending on weather.: Six to seven weeks is not the range mentioned by the installer.

Correct Answer: Lower upfront cost compared to in-ground pools.

Why this is correct: The installer says above-ground pools are more budget-friendly. In Burlington, they cost about 6,000 to 9,000 dollars installed, compared to at least 35,000 for in-ground pools. The lower upfront cost is a clear advantage.

Why the other options are wrong:

  • Higher resale value for the house.: Higher resale value is not mentioned as a benefit of above-ground pools.
  • No permit requirements in Burlington.: Both types require permits in Burlington - above-ground pools are not exempt.
  • Longer lifespan with minimal repairs.: Longer lifespan is not discussed as an advantage of above-ground pools.

Correct Answer: They can be used with above-ground pools if compatible.

Why this is correct: The installer says saltwater systems work well for above-ground pools as long as the equipment is compatible. The woman thought saltwater was only for in-ground pools, but the installer corrects this common belief.

Why the other options are wrong:

  • They are required for all in-ground pools.: The installer says many clients choose saltwater and it can work above ground with compatible equipment; a requirement for all in-ground pools is not stated.
  • They are more expensive to maintain than chlorine systems.: The installer says saltwater is cheaper to maintain over time, not more expensive.
  • They are not suitable for families with children.: Saltwater systems are not described as unsuitable for families with children.

Correct Answer: Her plan to relocate in the future.

Why this is correct: The installer recommends above-ground for families considering relocation because it offers a summer experience without a huge investment. The woman says they might move in five or six years; that possibility drives the advice.

Why the other options are wrong:

  • The local permit process in Halton Region.: The permit process is mentioned but does not drive the final recommendation.
  • The size of her backyard in Burlington.: The yard has not been measured yet, so its size is not a deciding factor.
  • Her interest in a saltwater system.: Her interest in saltwater is not the main reason behind his recommendation.

Correct Answer: Measure the yard and prepare a quote.

Why this is correct: The installer says he will measure the yard and go over available sizes. The woman asked for a quote on an above-ground option, and measuring is the first step. He mentions sizes usually range between 4 and 7 metres in diameter.

Why the other options are wrong:

  • Submit fencing documents to the city.: The provider offers to measure the yard for the above-ground pool. Submitting fencing approval documents is not proposed as the next step.
  • Schedule excavation for an in-ground pool.: She chose an above-ground pool, so excavation for an in-ground one is not needed.
  • Provide maintenance training for the family.: Maintenance training is not discussed as a next step in the conversation.

The rest of this explanation is for members. Sign in free to read why the other options are wrong, key words and tips.

Sign in to read the full explanation

With a free account: Retry and compare every attempt.
Be the first! No community answers here yet. Submit yours and help others learn.
Saving...